| Rapid MetroRail Gurgaon Limited (RMGL) रैपिड मेट्रो रेल गुड़गांव | |
|---|---|
![]() | |
| Background | |
| Owner | Rapid MetroRail Gurgaon Ltd. (RMGL) |
| Locale | Gurgaon, Haryana, India |
| Transit type | Metro |
| Number of lines | 1 |
| Number of stations | 6 |
| Daily ridership | 24,000 (per hour – projected) |
| Headquarters | Ambience Corporate Towers, Ambience Island, NH 8, Gurgaon |
| Operation | |
| Began operation | 14 November 2013 |
| Number of vehicles | 5 |
| Train length | 3 coaches |
| Headway | 4 minutes |
| Technical | |
| System length | 5.1 km[1] |
| No. of tracks |
2 (1.2 km)
[2]1 (3.7 km) |
| Track gauge | 1,435 mm (standard gauge)[2] |
| Electrification | 750 V, DC via third rail[3] |
| Average speed | 35 km/h (22 mph) |
| Top speed | 80 km/h (50 mph) |
Saturday, 16 November 2013
Rapid MetroRail Gurgaon Limited